power station Kirchbichl
Tyrol
Project:
Reinforcement of excavation pit for power house 2
Owner:
TIWAG Tiroler Wasserkraft AG, Innsbruck
Construction Company:
Ing. Hans Bodner, Baugesellschaft mbH & Co KG, Kufstein
Amount:
325 to steel profiles
HEA220 / HEA500 / HEB650 / HEB700 / HEB900
steel pipes from 813 to 1016 mm outer diameter, from 12.5 to 25 mm wall thickness